Final | 9/13/2004 | 9/13/2004 | 9/13/2004 | A | PASS |
Jim Storey
|
|
|
|
Rough-in | 7/21/2004 | 7/22/2004 | 7/22/2004 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/21/2004 at 4:12:23 PM. Contact: ###-####.
|
Rough-in | 7/21/2004 | 7/22/2004 | 7/22/2004 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/21/2004 at 4:12:23 PM. Contact: ###-####.
|
Rough-in | 7/21/2004 | 7/21/2004 | 7/21/2004 | P | FAIL |
Jim Storey
|
|
|
please call 15 mins prior to inspection//chris at ###-#### 2 nd time gas psi over 30# no insp. 7/21/2004 2:59:58 PM
|
Pressure Test | 7/16/2004 | 7/19/2004 | 7/19/2004 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 7/16/2004 at 3:17:21 PM. Contact: ###-####.
|
Rough-in | 7/16/2004 | 7/19/2004 | 7/19/2004 | A | FAIL |
Alan Hauser
|
|
|
pt failed for 2nd time, no inspections till paid 7/19/2004 12:18:34 PM
|
Pressure Test | 7/16/2004 | 7/16/2004 | 7/16/2004 | P | FAIL |
Alan Hauser
|
|
|
gage pressure over 30 pounds 7/16/2004 3:37:51 PM
|
Rough-in | 7/16/2004 | 7/16/2004 | 7/16/2004 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 7/16/2004 at 8:44:16 AM. Contact: ###-####.
|