Final | 9/24/2004 | 9/27/2004 | 9/27/2004 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 9/24/2004 at 3:21:00 PM. Contact: ###-####.
|
Final | 9/24/2004 | 9/27/2004 | 9/27/2004 | P | PASS |
Jim Sly
|
|
|
please call for access information if ya can't get in////ivan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Final | 9/23/2004 | 9/24/2004 | 9/24/2004 | A | FAIL |
Dixie Fellows
|
|
|
ivan -###-####--call 1st for access no access...called and left message 9/24/2004 10:43:44 AM
|
Final | 9/24/2004 | 9/24/2004 | 9/24/2004 | P | FAIL |
Jim Sly
|
|
|
please call regarding access information ###-#### ivan C/N prot post 9/24/2004 3:12:30 PM
|
Pressure Test | 7/21/2004 | 7/21/2004 | 7/21/2004 | A | PASS |
Tom Arcoraci
|
|
|
|
Rough-in | 7/21/2004 | 7/21/2004 | 7/21/2004 | A | PASS |
Tom Arcoraci
|
|
|
|
Rough-in | 7/19/2004 | 7/20/2004 | 7/20/2004 | A | FAIL |
Dixie Fellows
|
|
|
ivan; Phone #: ###-#### Internet Inspection Request from: Barbara Moore corrections not done 7/20/2004 10:55:55 AM
|
Rough-in | 7/19/2004 | 7/19/2004 | 7/19/2004 | P | FAIL |
Dixie Fellows
|
|
|
###-#### - irvin posted corrections 7/19/2004 4:13:37 PM
|