Final | 10/3/2005 | 10/4/2005 | 10/4/2005 | A | PASS |
Dixie Fellows
|
|
|
We did not do the gas piping or the range & hood. I had the girls in the office take it off the permit.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
Final | 10/3/2005 | 10/4/2005 | 10/3/2005 | A | CANC |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS Inspection cancelled from web by: APRIL THOMAS
|
Final | 9/22/2005 | 9/23/2005 | 9/23/2005 | A | NR |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS...call me when you can
|
Rough-in | 5/20/2005 | 5/23/2005 | 5/23/2005 | A | PART |
Dixie Fellows
|
|
|
please inspect hydronic tubing test as early monday am as possible. They are trying to pour concrete at 8am. Tests are in basement in mech room. Call me if questions. Thanks, Carol; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen
|
Rough-in | 5/19/2005 | 5/20/2005 | 5/20/2005 | A | FAIL |
Troy James
|
|
|
please inspect radiant tubing lines. 100 lbs tests are in the basement in the mechanical room. Call if ????. thanks carol; Phone #: ###-#### Internet Inspection Request from: Carol Rasmusssen pressure test failed to large garage, ok to place concre
|
Rough-in | 12/20/2004 | 12/20/2004 | 12/20/2004 | P | PASS |
Tom Arcoraci
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
Rough-in | 8/3/2004 | 8/4/2004 | 8/4/2004 | A | PART |
Troy James
|
|
|
I just need a partial rough-in inspection on heating ducts so that the builder can cover with concrete. My guys will be out there until you come. Call with any problems.; Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS Ok underground duct systems to be encased in concrete. 8/4/2004 10:34:44 AM
|