Final | 10/14/2004 | 10/15/2004 | 10/15/2004 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/14/2004 at 1:07:54 PM. Contact: ###-####. dropped secondary drains off pans into aisles away from racks to prevent any damage to supplies 10/15/2004 10:49:19 AM
|
Final | 10/13/2004 | 10/14/2004 | 10/14/2004 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/13/2004 at 3:46:41 PM. Contact: ###-####.
|
Rough-in | 9/13/2004 | 9/14/2004 | 9/14/2004 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/13/2004 at 1:28:43 PM. Contact: ###-####. ok to cover the dillard side (north?) 9/14/2004 9:08:45 AM
|
Rough-in | 9/2/2004 | 9/3/2004 | 9/3/2004 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/2/2004 at 9:46:00 AM. Contact: ###-####.
|