Final | 10/29/2004 | 10/29/2004 | 10/29/2004 | P | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/29/2004 at 9:05:00 AM. Contact: ###-####.
|
Final | 10/27/2004 | 10/28/2004 | 10/28/2004 | P | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/27/2004 at 10:58:30 PM. Contact: ###-####...off wylie 10/28/2004 8:49:24 AM
correction posted 10/28/2004 4:19:29 PM
|
Final | 10/7/2004 | 10/14/2004 | 10/14/2004 | P | NR |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 10/7/2004 at 10:03:18 AM. Contact: ###-####.
need all fixtures complete 10/14/2004 2:15:04 PM
|
Pressure Test | 8/4/2004 | 8/5/2004 | 8/5/2004 | A | PASS |
Jim Sly
|
|
|
###-#### brandon
|
Rough-in | 8/4/2004 | 8/5/2004 | 8/5/2004 | A | PASS |
Jim Sly
|
|
|
|