Final | 9/10/2004 | 9/13/2004 | 9/13/2004 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/10/2004 at 5:58:30 PM. Contact: ###-####.
|
Pressure Test | 9/10/2004 | 9/10/2004 | 9/10/2004 | P | DONE |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/10/2004 at 10:06:05 AM. Contact: ###-####.
|
Pressure Test | 8/18/2004 | 8/19/2004 | 8/19/2004 | A | FAIL |
Alan Hauser
|
|
|
stop work for all trades until leak in gasline repaired 8/19/2004 11:11:34 AM
|
Pressure Test | 8/19/2004 | 8/19/2004 | 8/19/2004 | P | PASS |
Jim Sly
|
|
|
Lindsay; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes
|
Pressure Test | 8/17/2004 | 8/18/2004 | 8/18/2004 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/17/2004 at 6:27:01 PM. Contact: ###-####.
|
Rough-in | 8/17/2004 | 8/18/2004 | 8/18/2004 | A | PART |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 8/17/2004 at 6:26:42 PM. Contact: ###-####. every thing ok but for pressure test 8/18/2004 10:56:59 AM
|
Pressure Test | 8/17/2004 | 8/17/2004 | 8/17/2004 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/17/2004 at 7:49:26 AM. Contact: ###-####. covered with insulation..called todd and told him to remove it 8/17/2004 2:46:38 PM
|
Rough-in | 8/17/2004 | 8/17/2004 | 8/17/2004 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/17/2004 at 7:48:59 AM. Contact: ###-####. covered with insulation 8/17/2004 2:46:21 PM
|