Final | 4/4/2005 | 4/4/2005 | 4/4/2005 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 4/4/2005 at 7:57:15 AM. Contact: ###-####.
|
Final | 3/22/2005 | 3/22/2005 | 3/22/2005 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/22/2005 at 7:00:12 AM. Contact: ###-####....off maple grove right on donnybrook 3/22/2005 1:14:40 PM need secondary drain on upstairs furnace 3/22/2005 2:15:16 PM
|
Pressure Test | 8/24/2004 | 8/25/2004 | 8/25/2004 | A | PASS |
Jim Sly
|
|
|
###-#### - ed
|
Rough-in | 8/24/2004 | 8/25/2004 | 8/25/2004 | A | PASS |
Jim Sly
|
|
|
###-#### - ed
|