Final | 8/2/2005 | 8/3/2005 | 8/3/2005 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 8/2/2005 at 3:13:00 PM. Contact: ###-####. final ok
|
Final | 7/28/2005 | 7/29/2005 | 7/29/2005 | A | FAIL |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 7/28/2005 at 4:47:09 PM. Contact: ###-####. exhaust is in the way of filter removal. pipe secondary drain from 2nd floor furnace to exterior.
|
Pressure Test | 9/28/2004 | 9/28/2004 | 9/28/2004 | P | PASS |
Lane Manuel
|
|
|
24psi 9/28/2004 2:33:10 PM
|
Rough-in | 9/28/2004 | 9/28/2004 | 9/28/2004 | P | PASS |
Lane Manuel
|
|
|
###-####
all correction items addressed. 9/28/2004 2:32:39 PM
|
Pressure Test | 9/22/2004 | 9/23/2004 | 9/23/2004 | P | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 9/22/2004 at 4:24:28 PM. Contact: ###-####.
|
Rough-in | 9/22/2004 | 9/23/2004 | 9/23/2004 | P | FAIL |
Alan Hauser
|
|
|
corrections not completed, and pressure test still on zero, no inspections till reinspection fee paid 9/23/2004 5:27:31 PM
|
Pressure Test | 9/20/2004 | 9/21/2004 | 9/21/2004 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 9/20/2004 at 3:52:06 PM. Contact: ###-####.
|
Rough-in | 9/20/2004 | 9/21/2004 | 9/21/2004 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 9/20/2004 at 3:51:45 PM. Contact: ###-####.
|