Final | 9/21/2004 | 9/23/2004 | 9/23/2004 | A | PASS |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Linda Hartwell...off crestwood and glenwood 9/23/2004 9:25:36 AM
|
Pressure Test | 9/16/2004 | 9/16/2004 | 9/16/2004 | P | FAIL |
Dixie Fellows
|
|
|
chris-- ###-#### call 1st before insp--re-insp leak 9/16/2004 3:15:05 PM
|
Rough-in | 9/16/2004 | 9/16/2004 | 9/16/2004 | P | PASS |
Dixie Fellows
|
|
|
crhis ###-#### -call 1st before insp--re-insp
|
Pressure Test | 9/14/2004 | 9/15/2004 | 9/15/2004 | P | NR |
Dixie Fellows
|
|
|
THANKS, ANDREA; Phone #: ###-#### Internet Inspection Request from: Andrea Creek
|
Rough-in | 9/14/2004 | 9/15/2004 | 9/15/2004 | P | NR |
Dixie Fellows
|
|
|
DIXIE, PLEASE CALL ME IF THERE ARE ANY CORRECTIONS,THANKS, ANDREA; Phone #: ###-#### Internet Inspection Request from: Andrea Creek
|