Final | 11/16/2004 | 11/17/2004 | 11/17/2004 | A | PASS |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 11/16/2004 at 3:13:34 PM. Contact: ###-####.
|
Pressure Test | 9/23/2004 | 9/24/2004 | 9/24/2004 | A | PASS |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/23/2004 at 11:28:38 AM. Contact: ###-####.
27 psi 9/24/2004 10:53:56 AM
|
Rough-in | 9/23/2004 | 9/24/2004 | 9/24/2004 | A | PASS |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 9/23/2004 at 11:29:02 AM. Contact: ###-####.
|