Final | 4/8/2005 | 4/11/2005 | 4/11/2005 | A | PASS |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 4/8/2005 at 3:04:53 PM. Contact: ###-####.
|
Rough-in | 9/28/2004 | 9/29/2004 | 9/29/2004 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 9/28/2004 at 3:01:06 PM. Contact: ###-####.
|
Final | 9/22/2004 | 9/22/2004 | 9/22/2004 | P | FAIL |
Dixie Fellows
|
|
|
snake river f/p ###-#### not read 9/22/2004 4:41:19 PM this should be a r/i....posted corrections on both f/p 9/22/2004 4:41:43 PM
|
Rough-in | 9/21/2004 | 9/22/2004 | 9/22/2004 | A | CANC |
Tony Young
|
|
|
snake river f/p- ###-####
|