Final | 10/27/2004 | 10/28/2004 | 10/28/2004 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/27/2004 at 11:06:32 AM. Contact: ###-####.
|
Pressure Test | 9/30/2004 | 10/1/2004 | 10/1/2004 | A | PASS |
Tom Arcoraci
|
|
|
###-#### - TODD NOTE: MANUAL RIGHT ON FLOOR INFRONT OF FIREPLACE
|
Rough-in | 9/30/2004 | 10/1/2004 | 10/1/2004 | A | PASS |
Tom Arcoraci
|
|
|
###-#### - TODD NOTE: MANUAL RIGHT IN FRONT OF FIREPLACE
|
Pressure Test | 9/28/2004 | 9/29/2004 | 9/29/2004 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/28/2004 at 5:28:33 PM. Contact: ###-####.
|
Rough-in | 9/28/2004 | 9/29/2004 | 9/29/2004 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 9/28/2004 at 5:28:17 PM. Contact: ###-####.
|