Pressure Test | 10/6/2004 | 10/7/2004 | 10/7/2004 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/6/2004 at 9:36:00 PM. Contact: ###-####. 60lb main from meter to roof ok...60lb to new rtu's ok 10/7/2004 10:04:10 AM
|
Pressure Test | 10/5/2004 | 10/6/2004 | 10/6/2004 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/5/2004 at 10:56:45 AM. Contact: ###-####....bad guage 10/6/2004 1:04:58 PM
|
Pressure Test | 9/27/2004 | 9/28/2004 | 9/28/2004 | A | FAIL |
Dixie Fellows
|
|
|
intermountain pipe ###-#### no approved mechanical plans on site 9/28/2004 10:27:38 AM
|
Rough-in | 9/27/2004 | 9/28/2004 | 9/28/2004 | A | FAIL |
Dixie Fellows
|
|
|
intermountain pipe ###-####
|