Pressure Test | 10/11/2004 | 10/12/2004 | 10/12/2004 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/11/2004 at 2:42:09 PM. Contact: ###-####. test witnessed by int gas....need 1/2" I.D. gas flex connector at furnace 10/12/2004 9:20:40 AM
|
Final | 10/11/2004 | 10/11/2004 | 10/11/2004 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/11/2004 at 8:13:28 AM. Contact: ###-####. W/H AND FURN OK...WAITING ON GAS TEST FOR PERMIT TO BE FINALED 10/11/2004 4:03:58 PM
|
Pressure Test | 10/11/2004 | 10/11/2004 | 10/11/2004 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/11/2004 at 8:12:51 AM. Contact: ###-####...off bogus basin 10/11/2004 1:05:53 PM
|