Final | 11/26/2004 | 11/26/2004 | 11/26/2004 | A | PASS |
Troy James
|
|
|
|
Final | 11/24/2004 | 11/24/2004 | 11/24/2004 | P | NR |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Veronica England poured concrete on stair well to 2nd story 11/24/2004 3:59:45 PM
|
Pressure Test | 10/7/2004 | 10/8/2004 | 10/8/2004 | A | PASS |
Dixie Fellows
|
|
|
|
Rough-in | 10/8/2004 | 10/8/2004 | 10/8/2004 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/8/2004 at 10:59:42 AM.
|
Pressure Test | 10/6/2004 | 10/7/2004 | 10/7/2004 | A | FAIL |
Jim Sly
|
|
|
###-#### - mocha C/N P/T fail upper unit (South) 10/7/2004 10:17:12 AM
|
Rough-in | 10/6/2004 | 10/7/2004 | 10/7/2004 | A | FAIL |
Jim Sly
|
|
|
###-#### - monica C/N Need listed nail plates at CSST. 10/7/2004 10:16:05 AM
|