Information based on query as of Sunday, June 30, 2024.
Permit Information
Permit NumberMEC04-02752
StatusFinaled
Name WESTERN HEATING & A/C
Site Address 4502 W HILLCREST DR
Project Name 
Customer Number 
ePlanReview 
Description
Mechanical Permit - New: relocate return from kitchen to basement, change 2 registers, vent dryer, install new fan vent, exhaust fans, gas pipe to bbq, range 2 fireplaces
Contact Information
See Activities list for contact information
Show All Activities
DescriptionReceivedRequestedCompletedAM/PMDispositionAssigned To 
Final2/23/20052/24/20052/24/2005ACANC
DetailsDixie Fellows
Please call John for access into house. Thank you!!; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt out of time...meeting..rescheduled for pm 2/24/2005 9:48:20 AM
Final2/24/20052/24/20052/24/2005PPASS
DetailsDave Hannah
###-#### call for access
Conference2/8/20052/8/20052/8/2005PPASS
DetailsDixie Fellows
Dustin ###-#### (Aaron office ###-####) Internet Inspection Request from: Aaron Alandt MET TO DISCUSS COMB AIR 2/8/2005 2:48:39 PM
Final2/7/20052/8/20052/8/2005AFAIL
DetailsDixie Fellows
Internet Inspection Request from: Aaron Alandt COMB AIR NOT SIZED CORRECTLY...NEED ACCESS TO GAS VALVE AT RANGE TO BE READILY ACCESSIBLE 2/8/2005 10:39:51 AM
Pressure Test10/19/200410/20/200410/20/2004APASS
DetailsTom Arcoraci
Phone #: ###-#### Internet Inspection Request from: Aaron Alandt
Conference10/14/200410/15/200410/15/2004APASS
DetailsDixie Fellows
mike; Phone #: ###-#### Note: Please if possible 9:00 am Internet Inspection Request from: Cathy Chiles met with int gas and western regarding comb air into equipment room 10/15/2004 9:30:52 AM
Pressure Test10/11/200410/12/200410/12/2004APASS
DetailsTom Arcoraci
Phone #: ###-#### Internet Inspection Request from: Aaron Alandt low press and med press pass 10/12/2004 9:49:33 AM
Rough-in10/11/200410/12/200410/12/2004APASS
DetailsTom Arcoraci
Phone #: ###-#### Internet Inspection Request from: Aaron Alandt
Pressure Test10/8/200410/11/200410/11/2004AFAIL
DetailsDixie Fellows
stronghold construction; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt tests failed...need btu load all all equipment including gas lights 10/11/2004 9:00:51 AM
Rough-in10/8/200410/11/200410/11/2004ANR
DetailsDixie Fellows
stronghold construction; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt