Final | 11/12/2004 | 11/15/2004 | 11/15/2004 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 11/12/2004 at 5:13:24 PM. Contact: ###-####.
|
Rough-in | 10/18/2004 | 10/18/2004 | 10/18/2004 | P | PASS |
Jim Sly
|
|
|
re-inps -lindsey-- ###-####
|
Pressure Test | 10/14/2004 | 10/14/2004 | 10/14/2004 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/14/2004 at 7:48:59 AM. Contact: ###-####.
|
Rough-in | 10/14/2004 | 10/14/2004 | 10/14/2004 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/14/2004 at 7:48:42 AM. Contact: ###-####.
|