Final | 3/7/2005 | 3/7/2005 | 3/7/2005 | P | PASS |
Dixie Fellows
|
|
|
Dixie, please after 3pm if you can.; Phone #: ###-#### Internet Inspection Request from: Donna Bledsoe
|
Final | 3/2/2005 | 3/2/2005 | 3/2/2005 | P | CANC |
Dixie Fellows
|
|
|
cel ###-#### Dixie, please come after 3pm thanks, Jennifer; Phone #: ###-#### Internet Inspection Request from: Donna Bledsoe meetings...called contractor to reschedule 3/2/2005 1:46:15 PM
|
Final | 2/7/2005 | 2/9/2005 | 2/9/2005 | P | FAIL |
Dixie Fellows
|
|
|
###-#### Donna Peterson; Phone #: ###-#### Internet Inspection Request from: Donna Bledsoe..OFF MAPLE GROVE SOUTH OF FRANKLIN 2/9/2005 12:08:53 PM DUCT COVERING UPPER COMB AIR OPENING..DRAIN PAN TERMINATION? 2/9/2005 4:29:30 PM
|
Final | 10/12/2004 | 10/12/2004 | 10/12/2004 | P | NR |
Tom Arcoraci
|
|
|
donna ###-####
|
Pressure Test | 10/12/2004 | 10/12/2004 | 10/12/2004 | P | PASS |
Tom Arcoraci
|
|
|
donna peterson ###-#### low press ok 10/12/2004 1:02:09 PM
|