Final | 11/10/2004 | 11/12/2004 | 11/12/2004 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 11/10/2004 at 4:32:56 PM. Contact: ###-####.
|
Final | 11/8/2004 | 11/8/2004 | 11/8/2004 | P | PART |
Alan Hauser
|
|
|
2nd floor office ok to cover 11/8/2004 4:28:59 PM
|
Rough-in | 10/21/2004 | 10/21/2004 | 10/21/2004 | P | PART |
Alan Hauser
|
|
|
duct ok, no grid at 2nd floor, flue ok and exhaust 10/21/2004 5:16:17 PM
|
Rough-in | 10/20/2004 | 10/20/2004 | 10/20/2004 | P | PART |
Alan Hauser
|
|
|
ducting ok, left c/n at office for what installation guides are needed 10/20/2004 3:28:02 PM
|
Rough-in | 10/18/2004 | 10/19/2004 | 10/19/2004 | A | FAIL |
Alan Hauser
|
|
|
need installation guide for boiler, open up chase to inspect boiler flue, and unit heater flue, maintain all clearances as per manufacture, and check exhaust ducting in area covered 10/19/2004 12:07:03 PM
|