Final | 3/2/2005 | 3/2/2005 | 3/2/2005 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/2/2005 at 11:21:37 AM. Contact: ###-####.
|
Pressure Test | 10/25/2004 | 10/25/2004 | 10/25/2004 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/25/2004 at 7:27:49 AM. Contact: ###-####. all existing lines onto roof ok at 20lb 10/25/2004 3:40:55 PM
|
Pressure Test | 10/22/2004 | 10/22/2004 | 10/22/2004 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/22/2004 at 6:29:52 AM. Contact: ###-####. no roof access 10/22/2004 10:53:36 AM
|
Pressure Test | 10/21/2004 | 10/21/2004 | 10/21/2004 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/21/2004 at 9:00:36 AM. Contact: ###-####...off curtis between emerald and morris hill 10/21/2004 12:20:41 PM THEY WILL RESCHEDULE 10/21/2004 4:40:30 PM
|