Final | 1/3/2006 | 1/3/2006 | 1/3/2006 | P | PASS |
Dixie Fellows
|
|
|
please call owner ###-#### Rob 30 min prior to meed for access///bob; Phone #: ###-#### Internet Inspection Request from: Letitia Mesa
|
Final | 10/11/2005 | 10/12/2005 | 10/12/2005 | A | PEND |
Dixie Fellows
|
|
|
This inspection is on the hydronic in-floor heat. Call Rob Gundlach @ ###-#### and he will let you in house.; Phone #: ###-#### Internet Inspection Request...i from: Shelly Albrecht...i will final this when other mechanical contractor calls for a final
|
Pressure Test | 3/28/2005 | 3/28/2005 | 3/28/2005 | P | PASS |
Troy James
|
|
|
Partial. Four in-floor heat lines to master bath.; Phone #: ###-#### Internet Inspection Request from: Shelly Albrecht
|
Pressure Test | 3/25/2005 | 3/25/2005 | 3/25/2005 | P | FAIL |
Troy James
|
|
|
Air handler units; Phone #: ###-#### Internet Inspection Request from: Shelly Albrecht
need 100# test to hydronic piping 3/25/2005 4:46:53 PM
|
Pressure Test | 11/14/2004 | 11/15/2004 | 11/15/2004 | A | PASS |
Alan Hauser
|
|
|
Upstairs in-floor heat; Phone #: ###-#### Internet Inspection Request from: Shelly Albrecht
|
Pressure Test | 10/22/2004 | 10/25/2004 | 10/25/2004 | A | PART |
Tony Young
|
|
|
Phone #: ###-#### Internet Inspection Request from: Shelly Albrecht
hydronic lines in slab for future use,,, could not see gauge,,, pouring concrete,,, contractor said it was 100 lbs pressure,,, will need to re-test later,,,, no gas line yet 10/25/2004 12:11:39 PM
|