Final | 2/18/2005 | 2/18/2005 | 2/18/2005 | A | PASS |
Troy James
|
|
|
for hood and make up air 2/18/2005 9:13:33 AM
|
Final | 2/17/2005 | 2/17/2005 | 2/17/2005 | P | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/17/2005 at 9:07:18 AM. Contact: ###-####. need air balance report 2/17/2005 3:14:03 PM
|
Final | 11/24/2004 | 12/3/2004 | 11/29/2004 | P | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/24/2004 at 12:23:59 PM. Contact: ###-####. was locked when Dixie went before will go out today
|
Rough-in | 11/5/2004 | 11/8/2004 | 11/8/2004 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/5/2004 at 1:05:45 PM. Contact: ###-####. CALLED AND LEFT MESSAGE...NO RESPONSE 11/8/2004 4:13:46 PM
|