Final | 5/15/2006 | 5/15/2006 | 5/15/2006 | P | PASS |
Troy James
|
|
|
|
Final | 11/11/2004 | 11/12/2004 | 11/12/2004 | A | FAIL |
Alan Hauser
|
|
|
no answer to knock on door 11/12/2004 1:36:14 PM
|
Final | 11/9/2004 | 11/10/2004 | 11/10/2004 | A | CANC |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 11/9/2004 at 4:13:41 PM. Contact: ###-####.
|
Final | 11/10/2004 | 11/10/2004 | 11/10/2004 | P | FAIL |
Troy James
|
|
|
Not ready for final, need to insulate all exposed metal duct in crawl. Pressure test ok 11/10/2004 3:27:18 PM
|