Final | 2/15/2005 | 2/16/2005 | 2/16/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/15/2005 at 4:24:17 PM. Contact: ###-####.
|
Final | 2/9/2005 | 2/11/2005 | 2/11/2005 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/9/2005 at 3:37:57 PM. Contact: ###-####. not even close to being ready..w/h and range not even installed yet 2/11/2005 4:23:43 PM
|
Pressure Test | 11/29/2004 | 11/29/2004 | 11/29/2004 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/29/2004 at 8:31:19 AM. Contact: ###-####.
|
Rough-in | 11/29/2004 | 11/29/2004 | 11/29/2004 | P | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 11/29/2004 at 8:31:39 AM. Contact: ###-####.
|
Rough-in | 11/24/2004 | 11/26/2004 | 11/26/2004 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/24/2004 at 1:00:17 PM. Contact: ###-####.
c/n posted on north side furnace,,, also gas pressure on north side fails 11/26/2004 11:01:45 AM
|
Pressure Test | 11/22/2004 | 11/23/2004 | 11/23/2004 | A | FAIL |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 11/22/2004 at 4:33:34 PM. Contact: ###-####.
one has bad gauge and one needs gas line supports,,, fix and recall 11/23/2004 11:37:50 AM
|