Final | 10/26/2005 | 10/26/2005 | 10/26/2005 | A | PASS |
Dixie Fellows
|
|
|
all gas lines in place and tested per plans
|
Pressure Test | 10/25/2005 | 10/27/2005 | 10/26/2005 | A | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/25/2005 at 11:32:16 AM. Contact: ###-####...wrong permit called in..talked to cory
|
Pressure Test | 10/7/2005 | 10/7/2005 | 10/7/2005 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/7/2005 at 8:36:31 AM. Contact: ###-####....1/2" gas line to f/p at tulleys coffee shop ok
|
Pressure Test | 8/30/2005 | 8/30/2005 | 8/30/2005 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 8/30/2005 at 6:39:18 AM. Contact: ###-####....2" 60lb test to roof of theatre equipment ok..approved regulator as well..11/4 60lb test to roof for future ti's ok...1" 60lb test to future ti's ok
|
Pressure Test | 8/17/2005 | 8/18/2005 | 8/18/2005 | P | PART |
Dixie Fellows
|
|
|
cory - ###-####...60lb test on 2 and 3" for 5lb systems ok..opd's are approved
|
MEC-Aging Inspection | 2/18/2005 | 2/18/2005 | 2/18/2005 | | FAIL |
Alan Hauser
|
|
|
no inspections called for 2/18/2005 9:48:28 AM
|