Final | 7/25/2006 | 7/26/2006 | 7/26/2006 | A | PASS |
Bill VanDegrift
|
|
|
Scheduled by a contractor via Hello! on 7/25/2006 at 11:37:49 AM. Contact: ###-####.
|
Final | 7/18/2006 | 7/18/2006 | 7/18/2006 | P | NH |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/18/2006 at 8:48:42 AM. Contact: ###-####...called michelle at 2:09..no return call
|
Final | 7/14/2006 | 7/17/2006 | 7/18/2006 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/14/2006 at 3:14:18 PM. Contact: ###-####...i called contractor to reschedule..i ran out of time..thanks
|
Final | 7/10/2006 | 7/11/2006 | 7/11/2006 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/10/2006 at 3:13:39 PM. Contact: ###-####...nobody on site..everythng looks lived in..
|
Pressure Test | 12/1/2004 | 12/2/2004 | 12/2/2004 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 12/1/2004 at 5:03:53 PM. Contact: ###-####.
|
Rough-in | 12/1/2004 | 12/2/2004 | 12/2/2004 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 12/1/2004 at 5:03:38 PM. Contact: ###-####.
|