Final | 1/7/2005 | 1/10/2005 | 1/10/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/7/2005 at 5:16:42 PM. Contact: ###-####.
|
Final | 1/4/2005 | 1/5/2005 | 1/5/2005 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/4/2005 at 5:25:23 PM. Contact: ###-####. Need Protection post. 1/5/2005 10:40:47 AM
|
Pressure Test | 12/6/2004 | 12/7/2004 | 12/7/2004 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/6/2004 at 4:35:17 PM. Contact: ###-####.
|
Pressure Test | 12/7/2004 | 12/7/2004 | 12/7/2004 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/7/2004 at 9:36:06 AM. Contact: ###-####. Per insp. changed date for insp.
|
Rough-in | 12/6/2004 | 12/7/2004 | 12/7/2004 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/6/2004 at 4:35:00 PM. Contact: ###-####.
|