Final | 1/17/2005 | 1/18/2005 | 1/18/2005 | A | PASS |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 1/17/2005 at 9:08:59 AM. Contact: ###-####.
|
Final | 1/13/2005 | 1/14/2005 | 1/14/2005 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/13/2005 at 3:57:06 PM. Contact: ###-####. doing hardwood floors 1/14/2005 10:23:12 AM
|
Pressure Test | 12/15/2004 | 12/16/2004 | 12/16/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 12/15/2004 at 2:41:07 PM. Contact: ###-####.
|
Rough-in | 12/15/2004 | 12/16/2004 | 12/16/2004 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 12/15/2004 at 2:40:57 PM. Contact: ###-####.
|
Pressure Test | 12/15/2004 | 12/15/2004 | 12/15/2004 | A | FAIL |
Dixie Fellows
|
|
|
I put this inspection in this morning for Linda Hartwell contact phone # is ###-#### also needs a rough-in insp. JRR posted corr for r/i and gas 12/15/2004 10:59:40 AM
|