Final | 1/19/2005 | 1/20/2005 | 1/20/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/19/2005 at 8:29:52 AM. Contact: ###-####.
|
Pressure Test | 1/6/2005 | 1/7/2005 | 1/7/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/6/2005 at 3:50:28 PM. Contact: ###-####.
|
Pressure Test | 1/6/2005 | 1/6/2005 | 1/6/2005 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/6/2005 at 8:33:29 AM. Contact: ###-####. guage pegged...need btu load 1/6/2005 3:03:34 PM
|
Pressure Test | 12/15/2004 | 12/16/2004 | 12/16/2004 | A | PART |
Troy James
|
|
|
fred ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
ok to cover gas line for suite 102 traveling through suite 103. 12/16/2004 9:25:49 AM
|
Pressure Test | 12/14/2004 | 12/14/2004 | 12/14/2004 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/14/2004 at 11:26:41 AM. Contact: ###-####. guage pegged...need striker plates 12/14/2004 4:00:22 PM
|
Pressure Test | 12/10/2004 | 12/13/2004 | 12/13/2004 | A | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: Linda Hartwell
|