Final | 3/30/2005 | 3/30/2005 | 3/30/2005 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 3/30/2005 at 10:38:44 AM. Contact: ###-####.
|
Rough-in | 1/4/2005 | 1/4/2005 | 1/4/2005 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 1/4/2005 at 9:00:31 AM. Contact: ###-####.
|
Rough-in | 12/24/2004 | 12/27/2004 | 12/27/2004 | A | FAIL |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 12/24/2004 at 11:32:51 AM. Contact: ###-####. lower unit to close to back of gyp at elbow. 12/27/2004 9:15:09 AM
|