Final | 1/27/2005 | 1/28/2005 | 1/28/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/27/2005 at 6:03:04 PM. Contact: ###-####.
|
Rough-in | 12/30/2004 | 1/3/2005 | 1/3/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 12/30/2004 at 3:30:58 PM. Contact: ###-####.
|
Pressure Test | 12/29/2004 | 12/30/2004 | 12/30/2004 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/29/2004 at 5:50:47 PM. Contact: ###-####.
|
Rough-in | 12/29/2004 | 12/30/2004 | 12/30/2004 | A | FAIL |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 12/29/2004 at 5:50:38 PM. Contact: ###-####. need to seal wall between shower stall and chase on second floor 12/30/2004 11:00:02 AM
|