Final | 2/1/2005 | 2/1/2005 | 2/1/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/1/2005 at 10:09:45 AM. Contact: ###-####.
|
Pressure Test | 1/3/2005 | 1/4/2005 | 1/4/2005 | A | PASS |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 1/3/2005 at 5:10:16 PM. Contact: ###-####.
25 psi 1/4/2005 10:30:06 AM
|
Rough-in | 1/3/2005 | 1/4/2005 | 1/4/2005 | A | PASS |
Lane Manuel
|
|
|
Scheduled by a contractor via Hello! on 1/3/2005 at 5:10:06 PM. Contact: ###-####.
|