Final | 1/28/2005 | 1/31/2005 | 1/31/2005 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/28/2005 at 3:14:31 PM. Contact: ###-####.
|
Rough-in | 1/26/2005 | 1/27/2005 | 1/27/2005 | A | PART |
Dixie Fellows
|
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles detectors in place..need secondary drain in place..need fire dampers and grilles 1/27/2005 9:58:30 AM
|
Rough-in | 1/20/2005 | 1/21/2005 | 1/21/2005 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/20/2005 at 3:22:11 PM. Contact: ###-####. DUCT DETECTORS NOT INSTALLED PER MANUF...NEED SECONDARY CONDENSATES 1/21/2005 4:34:29 PM
|