Final | 5/3/2005 | 5/3/2005 | 5/3/2005 | P | PASS |
Troy James
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
Pressure Test | 1/24/2005 | 1/24/2005 | 1/24/2005 | A | PASS |
Alan Hauser
|
|
|
Phone #: ###-#### Internet Inspection Request from: APRIL THOMAS
|
Rough-in | 1/24/2005 | 1/24/2005 | 1/24/2005 | A | PART |
Alan Hauser
|
|
|
r-6 insulation on supply duct at attic and crawlspace ok on this job, all future job supply air duct at attic and crawlspace to be r-8 as per 2003 IECC table 503.3.3.3 1/24/2005 12:19:40 PM
|