Final | 2/2/2005 | 2/2/2005 | 2/2/2005 | P | PASS |
Jim Sly
|
|
|
fred; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Pressure Test | 1/11/2005 | 1/11/2005 | 1/11/2005 | P | PASS |
Jim Sly
|
|
|
doyle; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
Rough-in | 1/7/2005 | 1/10/2005 | 1/10/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/7/2005 at 1:58:05 PM. Contact: ###-####.
|
Pressure Test | 1/6/2005 | 1/7/2005 | 1/7/2005 | A | FAIL |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/6/2005 at 3:51:46 PM. Contact: ###-####. Gage stuck at 15 lb at release.....called Contr. 1/7/2005 12:18:50 PM
|
Pressure Test | 1/6/2005 | 1/6/2005 | 1/6/2005 | P | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/6/2005 at 8:35:07 AM. Contact: ###-####. guage pegged...need btu load 1/6/2005 3:03:46 PM
|