Final | 3/2/2005 | 3/3/2005 | 3/3/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/2/2005 at 2:55:51 PM. Contact: ###-####.
|
Final | 2/25/2005 | 2/28/2005 | 2/28/2005 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/25/2005 at 4:47:22 PM. Contact: ###-####. posted corrections...called contractor 2/28/2005 1:18:09 PM
|
Rough-in | 1/12/2005 | 1/13/2005 | 1/13/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 1/12/2005 at 3:01:17 PM. Contact: ###-####.
|
Pressure Test | 1/10/2005 | 1/11/2005 | 1/11/2005 | A | PASS |
Jim Sly
|
|
|
design air ###-####
|
Pressure Test | 1/6/2005 | 1/7/2005 | 1/7/2005 | A | NR |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 1/6/2005 at 3:02:24 PM. Contact: ###-####. owner decided to add barbeque 1/7/2005 9:15:33 AM
|
Pressure Test | 1/7/2005 | 1/7/2005 | 1/7/2005 | P | FAIL |
Dixie Fellows
|
|
|
undersized...talked to darrin 1/7/2005 3:41:13 PM
|