Final | 6/3/2005 | 6/3/2005 | 6/3/2005 | P | PASS |
Dixie Fellows
|
|
|
Reinspection for final. THANKS!; Phone #: ###-#### Internet Inspection Request from: DeAnna Barrett
|
Final | 6/1/2005 | 6/2/2005 | 6/3/2005 | P | FAIL |
Dixie Fellows
|
|
|
Phone #: ###-#### Internet Inspection Request from: DeAnna Barrett...posted corrections
|
Rough-in | 4/25/2005 | 4/26/2005 | 4/26/2005 | P | PASS |
Dixie Fellows
|
|
|
Thank you; Phone #: ###-#### Internet Inspection Request from: DeAnna Barrett...will check duct detectors and secondary drains at next inspection 4/26/2005 4:18:00 PM
|
Rough-in | 4/25/2005 | 4/26/2005 | 4/25/2005 | A | CANC |
Alan Hauser
|
|
|
THANKS!; Phone #: ###-#### Internet Inspection Request from: DeAnna Barrett Inspection cancelled from web by: DeAnna Barrett
|
Rough-in | 4/22/2005 | 4/25/2005 | 4/25/2005 | A | NR |
Alan Hauser
|
|
|
Phone #: ###-#### Internet Inspection Request from: DeAnna Barrett
|
Pressure Test | 1/12/2005 | 1/13/2005 | 1/13/2005 | A | PASS |
Alan Hauser
|
|
|
Late morning if possible -- THANKS!!; Phone #: ###-#### Internet Inspection Request from: DeAnna Barrett
|
Pressure Test | 1/13/2005 | 1/13/2005 | 1/13/2005 | P | PASS |
Alan Hauser
|
|
|
had staff meeting am, carried this over to early pm
|