Final | 3/14/2005 | 3/14/2005 | 3/14/2005 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/14/2005 at 8:05:28 AM. Contact: ###-####.
|
Final | 3/14/2005 | 3/14/2005 | 3/14/2005 | P | PASS |
Dixie Fellows
|
|
|
James; Phone #: ###-#### Internet Inspection Request from: Jan Rice
|
Final | 3/2/2005 | 3/3/2005 | 3/3/2005 | A | FAIL |
Dixie Fellows
|
|
|
james ###-#### no address posted... reinspection fee 3/3/2005 9:48:25 AM
|
Final | 3/1/2005 | 3/2/2005 | 3/2/2005 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/1/2005 at 4:17:11 PM. Contact: ###-####. meetings...called contractor to reschedule 3/2/2005 1:42:28 PM
|
Pressure Test | 1/13/2005 | 1/14/2005 | 1/14/2005 | A | PASS |
Dixie Fellows
|
|
|
james; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Rough-in | 1/13/2005 | 1/14/2005 | 1/14/2005 | A | PASS |
Dixie Fellows
|
|
|
james; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Pressure Test | 1/12/2005 | 1/12/2005 | 1/12/2005 | P | PART |
Lane Manuel
|
|
|
###-#### - Air care
fresh concrete unit on the right. Could not get to pressure gauge (called contractor: to reschedule) 1/12/2005 2:00:26 PM
|
Rough-in | 1/12/2005 | 1/12/2005 | 1/12/2005 | P | PART |
Lane Manuel
|
|
|
###-#### - Air care
|