Final | 3/1/2005 | 3/2/2005 | 3/2/2005 | A | PASS |
Alan Hauser
|
|
|
|
Final | 3/1/2005 | 3/1/2005 | 3/1/2005 | P | NR |
Jim Storey
|
|
|
Scheduled by a contractor via Hello! on 3/1/2005 at 9:08:22 AM. Contact: ###-####. com job rolled over to am.
|
Pressure Test | 1/25/2005 | 1/26/2005 | 1/26/2005 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 1/25/2005 at 2:03:39 PM. Contact: ###-####.
|
Pressure Test | 1/24/2005 | 1/25/2005 | 1/25/2005 | A | FAIL |
Alan Hauser
|
|
|
60 pound test required for 2 pound system and need access to roof for inspection 1/25/2005 12:20:43 PM
|
Rough-in | 1/13/2005 | 1/14/2005 | 1/14/2005 | P | PART |
Alan Hauser
|
|
|
duct ok back room only, no gas pipe at this time 1/14/2005 2:34:47 PM
|