Final | 2/14/2005 | 2/15/2005 | 2/15/2005 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 2/14/2005 at 3:39:30 PM. Contact: ###-####.
|
Pressure Test | 1/24/2005 | 1/25/2005 | 1/25/2005 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 1/24/2005 at 6:44:45 PM. Contact: ###-####.
|
Rough-in | 1/24/2005 | 1/25/2005 | 1/25/2005 | A | PASS |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 1/24/2005 at 6:44:35 PM. Contact: ###-####.
|
Pressure Test | 1/21/2005 | 1/21/2005 | 1/21/2005 | P | PASS |
Alan Hauser
|
|
|
###-#### lindsey
|
Rough-in | 1/21/2005 | 1/21/2005 | 1/21/2005 | P | FAIL |
Alan Hauser
|
|
|
no access to second floor, stair treads are removed from stairs 1/21/2005 2:49:42 PM
|