Final | 2/11/2005 | 2/14/2005 | 2/14/2005 | A | PASS |
Dave Hannah
|
|
|
Scheduled by a contractor via Hello! on 2/11/2005 at 3:18:39 PM. Contact: ###-####.
|
Rough-in | 1/25/2005 | 1/26/2005 | 1/26/2005 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 1/25/2005 at 11:48:58 AM. Contact: ###-####.
|
Rough-in | 1/20/2005 | 1/21/2005 | 1/21/2005 | A | FAIL |
Alan Hauser
|
|
|
no tape on metal to metal joints, only nashua 367-17or mastic 1/21/2005 12:52:20 PM
|