Final | 2/23/2005 | 2/24/2005 | 2/24/2005 | A | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/23/2005 at 5:08:32 PM. Contact: ###-####. out of time..rescheduled for pm 2/24/2005 9:48:31 AM
|
Final | 2/24/2005 | 2/24/2005 | 2/24/2005 | P | PASS |
Dixie Fellows
|
|
|
###-####
|
Final | 2/22/2005 | 2/23/2005 | 2/23/2005 | A | NH |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 2/22/2005 at 6:11:29 PM. Contact: ###-####. No access.....called contr. 2/23/2005 9:16:33 AM
|
Pressure Test | 1/26/2005 | 1/27/2005 | 1/27/2005 | A | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/26/2005 at 2:15:43 PM. Contact: ###-####.
|
Pressure Test | 1/27/2005 | 1/27/2005 | 1/27/2005 | P | PASS |
Jim Sly
|
|
|
###-####.
|
Rough-in | 1/26/2005 | 1/27/2005 | 1/27/2005 | A | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/26/2005 at 2:15:34 PM. Contact: ###-####. out of time, i had a meeting..i rescheduled this for pm 1/27/2005 10:02:40 AM
|
Rough-in | 1/27/2005 | 1/27/2005 | 1/27/2005 | P | PASS |
Jim Sly
|
|
|
###-####.
|