Final | 3/29/2005 | 3/30/2005 | 3/30/2005 | A | PASS |
Jim Storey
|
|
|
lindsay ###-####
|
Final | 3/1/2005 | 3/2/2005 | 3/2/2005 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 3/1/2005 at 3:58:28 PM. Contact: ###-####. corrections not done, reinspection fee 3/2/2005 11:41:13 AM
|
Final | 2/15/2005 | 2/16/2005 | 2/16/2005 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 2/15/2005 at 4:44:06 PM. Contact: ###-####. c/n posted at furnace 2/16/2005 11:29:16 AM
|
Rough-in | 1/28/2005 | 1/31/2005 | 1/31/2005 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 1/28/2005 at 3:31:12 PM. Contact: ###-####.
|
Rough-in | 1/26/2005 | 1/27/2005 | 1/27/2005 | A | NR |
Alan Hauser
|
|
|
talked to installer about different options on venting furnace/water heater 1/27/2005 10:25:46 AM
|
Rough-in | 1/25/2005 | 1/26/2005 | 1/26/2005 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 1/25/2005 at 6:38:14 PM. Contact: ###-####.
|