Final | 3/10/2005 | 3/10/2005 | 3/10/2005 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/10/2005 at 8:48:30 AM. Contact: ###-####...off 28th 3/10/2005 1:58:36 PM
|
Final | 3/7/2005 | 3/8/2005 | 3/8/2005 | A | FAIL |
Troy James
|
|
|
Scheduled by a contractor via Hello! on 3/7/2005 at 3:49:55 PM. Contact: ###-####. need secondary drain to terminate to exterior not over wood floor 3/8/2005 9:37:25 AM
|
Pressure Test | 1/31/2005 | 2/1/2005 | 2/1/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/31/2005 at 2:18:14 PM. Contact: ###-####.
|
Rough-in | 1/31/2005 | 2/1/2005 | 2/1/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 1/31/2005 at 2:17:58 PM. Contact: ###-####...b-vent on 2nd floor not framed..left notice for structural to check...called lindsay 2/1/2005 9:23:43 AM
|