Final | 4/14/2005 | 4/15/2005 | 4/15/2005 | P | PASS |
Lee Rice
|
|
|
Scheduled by a contractor via Hello! on 4/14/2005 at 3:30:50 PM. Contact: ###-####.
|
Rough-in | 2/11/2005 | 2/14/2005 | 2/14/2005 | A | PASS |
Troy James
|
|
|
mary - ###-####
|
Rough-in | 2/10/2005 | 2/11/2005 | 2/11/2005 | A | CANC |
Alan Hauser
|
|
|
mary; Phone #: ###-#### Internet Inspection Request from: Barbara Moore alan was gone 2/11/2005 3:18:27 PM
|
Pressure Test | 2/9/2005 | 2/10/2005 | 2/10/2005 | A | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 2/9/2005 at 2:58:48 PM. Contact: ###-####.
|
Rough-in | 2/9/2005 | 2/10/2005 | 2/10/2005 | A | FAIL |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 2/9/2005 at 2:58:30 PM. Contact: ###-####. need rescheck report 2/10/2005 12:15:52 PM
|