Final | 4/22/2005 | 4/25/2005 | 4/25/2005 | A | PASS |
Troy James
|
|
|
please call for access codes///air experts; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Rough-in | 3/17/2005 | 3/18/2005 | 3/18/2005 | A | PASS |
Dixie Fellows
|
|
|
air experts; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
|
Rough-in | 3/16/2005 | 3/17/2005 | 3/17/2005 | A | NR |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 3/16/2005 at 3:00:18 PM. Contact: ###-####. reinspection fee 3/17/2005 10:19:59 AM
|
Rough-in | 3/3/2005 | 3/4/2005 | 3/4/2005 | A | PART |
Tony Young
|
|
|
Scheduled by a contractor via Hello! on 3/3/2005 at 4:53:28 PM. Contact: ###-####.
c/n for frame inspector to check,,, ok to cover after,,, sheild and chase requirements 3/4/2005 11:20:45 AM
|
Rough-in | 2/25/2005 | 2/28/2005 | 2/28/2005 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 2/25/2005 at 3:41:22 PM. Contact: ###-####. r/i failed..posted corrections...gas ok 20lb 2/28/2005 1:17:56 PM
|