Final | 4/11/2005 | 4/11/2005 | 4/11/2005 | P | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 4/11/2005 at 8:59:25 AM. Contact: ###-####.
|
Pressure Test | 3/9/2005 | 3/10/2005 | 3/10/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/9/2005 at 4:58:08 PM. Contact: ###-####.
|
Rough-in | 3/9/2005 | 3/10/2005 | 3/10/2005 | A | PASS |
Jim Sly
|
|
|
Scheduled by a contractor via Hello! on 3/9/2005 at 4:57:44 PM. Contact: ###-####.
|