Final | 12/29/2005 | 12/29/2005 | 12/29/2005 | A | PASS |
Dixie Fellows
|
|
|
|
Final | 11/11/2005 | 11/14/2005 | 11/14/2005 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 11/11/2005 at 9:33:57 AM. Contact: ###-####...walked job with rob and discussed corrections with him..need equipment list, model numbers and prices faxed to rita deyoung at ###-#### before final signed...dixie
|
Final | 10/27/2005 | 10/27/2005 | 10/27/2005 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/27/2005 at 9:47:29 AM. Contact: ###-####....temp occu ok
|
Final | 10/27/2005 | 10/28/2005 | 10/27/2005 | A | CANC |
Dixie Fellows
|
|
|
rob ###-####
|
Conference | 10/5/2005 | 10/6/2005 | 10/6/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/5/2005 at 2:52:55 PM. Contact: ###-####....discussed venting of boilers
|
Mec-Aging Inspection | 8/9/2005 | 8/16/2005 | 8/15/2005 | A | PASS |
Dixie Fellows
|
|
|
wip
|
Mec-Aging Inspection | 8/2/2005 | 8/9/2005 | 8/9/2005 | A | CANC |
Lee Rice
|
|
|
|
Mec-Aging Inspection | 7/29/2005 | 8/2/2005 | 8/2/2005 | A | CANC |
Lee Rice
|
|
|
|
MEC-Aging Inspection | 7/28/2005 | 7/28/2005 | 7/29/2005 | | CANC |
Lee Rice
|
|
|
|
MEC-Aging Inspection | 5/23/2005 | 5/23/2005 | 5/25/2005 | | DEFR |
Dixie Fellows
|
|
|
|
Rough-in | 3/21/2005 | 3/21/2005 | 3/21/2005 | P | PART |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 3/21/2005 at 9:59:18 AM. Contact: ###-####. returns in walls ok for cover, only thing looked at 3/21/2005 2:30:14 PM
|