Final | 10/31/2005 | 10/31/2005 | 10/31/2005 | P | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 10/31/2005 at 9:45:01 AM. Contact: ###-####.
|
MEC-Aging Inspection | 9/14/2005 | 9/14/2005 | 9/14/2005 | | PASS |
Dixie Fellows
|
|
|
wip
|
Final | 7/15/2005 | 7/15/2005 | 7/15/2005 | P | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 7/15/2005 at 9:20:22 AM. Contact: ###-####...3rd floor corridor and shell ok..1st 3rd shell and core ok..unable to finish 2nd floor corridor due to ti
|
Rough-in | 6/20/2005 | 6/21/2005 | 6/21/2005 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/20/2005 at 2:09:22 PM. Contact: ###-####...heat pump and duct work at entry ok...all shaft dampers and access doors in place
|
Rough-in | 6/6/2005 | 6/7/2005 | 6/7/2005 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 6/6/2005 at 3:20:53 PM. Contact: ###-####....3rd floor shell and core all units, bath exhausts in place...2nd floor shell and core all units, bath exhausts in place..ok to cover hard lids on 1st..2nd..3rd floor shell and core
|
Rough-in | 5/27/2005 | 5/31/2005 | 5/31/2005 | A | PART |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 5/27/2005 at 10:58:47 AM. Contact: ###-####....looked at duct work in shaft as well as s/f dampers...will check access at later date..structural inspector requested fire caulking around angles on outside
|