Final | 6/8/2005 | 6/9/2005 | 6/9/2005 | P | PASS |
Alan Hauser
|
|
|
Scheduled by a contractor via Hello! on 6/8/2005 at 4:32:22 PM. Contact: ###-####.
|
Pressure Test | 4/13/2005 | 4/14/2005 | 4/14/2005 | P | FAIL |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/13/2005 at 4:22:53 PM. Contact: ###-####.
|
Pressure Test | 4/14/2005 | 4/14/2005 | 4/14/2005 | P | PASS |
Tom Arcoraci
|
|
|
|
Rough-in | 4/13/2005 | 4/14/2005 | 4/14/2005 | P | PASS |
Tom Arcoraci
|
|
|
Scheduled by a contractor via Hello! on 4/13/2005 at 4:22:36 PM. Contact: ###-####.
|
Pressure Test | 4/8/2005 | 4/11/2005 | 4/11/2005 | A | PASS |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/8/2005 at 4:29:36 PM. Contact: ###-####.
|
Rough-in | 4/8/2005 | 4/11/2005 | 4/11/2005 | A | FAIL |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/8/2005 at 4:29:25 PM. Contact: ###-####....screw in b-vent 4/11/2005 12:07:13 PM
|
Pressure Test | 4/8/2005 | 4/8/2005 | 4/8/2005 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/8/2005 at 8:56:35 AM. Contact: ###-####. called melissa to reschedule 4/8/2005 4:18:14 PM
|
Rough-in | 4/8/2005 | 4/8/2005 | 4/8/2005 | P | CANC |
Dixie Fellows
|
|
|
Scheduled by a contractor via Hello! on 4/8/2005 at 8:56:14 AM. Contact: ###-####...off maple grove and ustick 4/8/2005 3:14:57 PM called melissa to reschedule 4/8/2005 4:18:28 PM
|
Pressure Test | 4/5/2005 | 4/6/2005 | 4/6/2005 | P | FAIL |
Jim Sly
|
|
|
design air ###-####
Gas line not installed. 4/6/2005 4:41:27 PM
|
Rough-in | 4/5/2005 | 4/6/2005 | 4/6/2005 | P | FAIL |
Jim Sly
|
|
|
design air ###-#### C/N posted 4/6/2005 4:40:54 PM
|